Air gap in cold mould (K):
To assure the dimension "K" required for the heat expansion of the hot 230 V manifold, the customer must grind the pressure pad to the correct dimension.
Gate diameter <= 1.2 mm (ΔL):
For gate diameters smaller than ØD = 1.2mm, the nozzle must be installed further back (ΔL) from the gate.